Kiln Shell Replacement at Holcim Eclépens facility (CH)
The order consisted of engineering, manufacturing and installation of a new Kiln Shell. The shell has been designed by DSD, was manufactured in North Italy and was delivered complete of fixation system.
The engineering and manufacturing period was of three months while the erection was of 18 days and has been executed by a team of 14 DSD high skilled employees.
For the main lifting activities, we used a 450 to Crane (LTM1300), which came from the group owned equipment parc. Executive CompanyDSD Steel Montaggio Technology S.r.l.P.za della Repubblica 1920124 Milan Italy |