Danube-Black Sea Canal, Constanta/RomaniaDSD NOELL performed the following services on three of the four locks (Cernavoda, Agigea and Ovidiu): Calculation, construction, manufacturing, shipping, dismantling and reassembly of three lifting gates and four miter gates, the repair works on one remaining safety gate, eight culvert gates as well as all the hydraulic drives including control systems. A similar capacity of work has been planned for the second phase. |