Crane girder ArcelorMittal

Disassembly and assembly of a 85 metric ton heavy crane girder in a converter steel mill. Production downtime: 72 hours.
Planning, disassembly, assembly and inspection of a new crane track, busbars and cables and also the charging of the existing girder.

  • Client: ArcelorMittal Eisenhüttenstadt GmbH
  • Period: 08.2013
  • Location: Eisenhüttenstadt, Germany

Executive Company

DSD Industrieanlagen Technik GmbH