nach oben

Sava Bridge, Ada Ciganlija

  • Location: Belgrade, Serbia
  • Client: City of Belgrade, Joint venture PORR-DSD-SCT
  • Construction period: 2008 - 2012
  • Type of construction: Cable-stayed bridge
  • Construction weight: 9,000 t
  • Total length: 964 m
  • Spans: 70 m - 108 m - 80 m - 376 m - 200 m - 50 m

Main bridge as three-cell box girder with orthotropic deck, foreshore bridge in prestressed concrete.

Executive Company

DSD Brückenbau GmbH

Hessische Straße 11
10115 Berlin
Germany
Details