Sava Bridge, Ada Ciganlija
- Location: Belgrade, Serbia
- Client: City of Belgrade, Joint venture PORR-DSD-SCT
- Construction period: 2008 - 2012
- Type of construction: Cable-stayed bridge
- Construction weight: 9,000 t
- Total length: 964 m
- Spans: 70 m - 108 m - 80 m - 376 m - 200 m - 50 m
Main bridge as three-cell box girder with orthotropic deck, foreshore bridge in prestressed concrete.