Sava bridge, Ada Ciganlija
Location: Belgrade, Serbia
Client: City of Belgrade, PORR-DSD-SCT
Construction period: 2008 - 2012
Construction type: Cable-stayed bridge
Construction weigth: 9,000 metric tons
Total length: 964m
Spans: 70m - 108m - 80m - 80m - 376m - 200m - 50m
The main bridge is constructed as a continuous beam box girder with a deck out of orthotropic material, the foreland bridge is made of pre-stressed concrete.