nach oben

LURGI - AIR LIQUIDE (2013 - 2014)

Construction of a new HYCO plant for Bayer in the industrial area Chempark in Dormagen, Germany.
Assembly of an H2 reformer, cold boxes, modules, compressors, pumps, equipment, structures, pipe racks etc. Fabrication and assembly of pipelines. Installation of refractory materials and external insulation of pipelines and equipment.
Equipment weight: 4,170 metric tons
Structure weight: 1,100 metric tons
Piping weight: 730 metric tons
Project period: 14 months
Materials: carbon steel / stainless steel / alloy steel

Executive Company

Setilgest Serviços Técnicos de Gestão e Engenharia, S.A.

Rua D. Luís de Noronha, n.º 4 - 5º Andar
1050-072 Lisboa
Portugal
Details