nach oben

CFB-power plants BINUGAO #1 and # 2

Industry: Power plants
Location: Binugao, Toril, Davao City, Mindanao Island – Philippines
Client: Formosa Heavy Industries Corp., Taiwan
Scope: Engineering, material supply, assembly, and drying
Refractory material: 2,000 metric tons
Year: 2014 and 2015
Duration: 13 months
Maximum manpower: 120
LTI: 0

 

Executive Company

SET LININGS INTERNATIONAL

Condomínio Empresarial da Moita – Bloco I
Abreu Pequeno
2860-579 Moita
Portugal
Details