EDA – RENOVÁVEIS – AZORESSetilgest was selected to perform the engineering, supply, fabrication, installation, painting and tests of injection geothermal fluid system and auxiliary equipment, including pumps, 600 m3 tank, rock muffler, E&I and miscellaneous for the new CGPA geothermal plant in Terceira Island – Azores.
|