DSD Montagetechnik GmbH

Secondary dedusting steel mill

Place: Dillingen Saar, Germany

Client: AG der Dillinger Hüttenwerke

Construction period: 2009-2010

Scope of supply: Fabrication, delivery and erection of ducts (approx. 1,500 to) in the inner and outer area
                               of the steel  mill and fabrication, delivery and erection of steel structures for the
                               reconstruction and reinforcement (approx. 685 to) of the converter housings

Hisarna Pilot Plant

Place: Ijmuiden/Netherlands

Client: Tata Steel

Construction period: 2010-2011

Scope of supply: Fabrication, delivery and erection of steel structures, mechanical equipment, piping and
                               electrical works for an alloying plant with reduced Co2-emission.

Steam accumulator

Place: Dillingen Saar, Germany

Client: AG der Dillinger Hüttenwerke

Construction period: 2009

Scope of supply: Engineering, fabrication, delivery and erection incl. pressure testing of a spherical
                               steam accumulator (inner diameter 11,000 mm; height 2,000 mm)

Saarschmiede Völklingen

Place: Völklingen, Germany

Client: Saarschmiede Freiformschmiede GmbH

Construction period: 2008-2009

scope of supply: delivery and erection of approx. 17.500 to steel structures

lignite - fired power plant Lippendorf 2x930 MW

Place: Lippendorf/Germany

Client: VEAG Berlin  

Construction period: 1996 - 1999

Scope of supply: Detail engineering, fabrication and transport of

                                 - steel structures approx. 51.000 to

                                 - ducts approx. 5.400 to

                                 - buckstays approx. 4.000 to

Commerzbank Tower, Frankfurt

Place: Frankfurt/Germany

Client:

Construction period: 1994 - 1996

Contruction weight: approx. 18.500 to

Scope of supply: - Detail engineering, supply and erection of the steel structures
                                - delvivery and Erection of steel deckings,
                                - fire protection works

Power Plant Niederaußem 1.000 MW

Place: Niederaußem/Germany

Client: RWE Essen and subcontracors

Construction period: 1999 - 2002

Scope of supply: primary steel structures preparation of workshop drawings, fabrication, supply, erection
                               coal conveyor bridges engineering works, supply and erection of the coal conveyor
                               bridges from open cast to power plant (JV),
                               delivery and erection

                                 - boiler supports 8.100 to

                                 - boiler houses 11.500 to

                                 - buckstays 1.500 to