DSD HILGERS Stahlbau GmbH
Place: GVZ Bayernhafen Nürnberg/Germany
Client: TriCon Container-Terminal Nürnberg GmbH
Maximum load bearing capacity on the spreader: 41t
Track gauge: 39.800mm
Hoisting high: 12.500mm
Crane travel speed: 120 m/min
Cross travel speed: 100 m/min
Rotation speed: 1,5-2 U/min
Hoisting speed at full lifting capacity: 15m/min
Hoisting speed in weak field operation: 30m/min
Place: Hafen Walsum-Süd
Client: Eisenbahn und Häfen GmbH
Maximum load bearing capacity on the magnet cross beam: 36 t
Track gauge: 33.400 mm
Hoisting High: + 6.500 mm (OK Kaimauer), -15.500 mm (UK Magnettraverse)
Crane travel speed: max. 80 m/min.
Cross travel speed: max. 140 m/min.
Hoisting speed at full lifting capacity: 45 m/min.
Hoisting speed in weak field operation: 90 m/min
Place: GVZ Hafen Nürnberg Roth
Client: Hafen Nürnberg Roth GmbH
Maximum load bearing capacity on the spreader: 41 t
Track gauge: 39.800 mm
Hoisting height: max. 12.500 mm
Crane travel speed: max. 120 m/min.
Cross travel speed: max. 80 m/min.
Hoisting speed at full lifting capacity: 20 m/min.
Hoisting speed in weak field operation: 40/50 m/min
Place: Ubf Köln Eifeltor
Client: DB Netz AG
Maximum load bearing capacity on the spreader: 41 t
Track gauge: 39.500 mm
Serviceable length, cantilever arm: 6.750m
Hoisting height: max. 12.000 mm
Crane travel speed: max. 120 m/min.
Cross travel speed: max. 80 m/min.
Rotation speed: 2 U/min.
Hoisting speed at full lifting capacity: 15 m/min.
Hoisting speed in weak field operation: 30 m/min
Place: Voerde, Germany
Client: RWE Power AG
Construction period: 2005
Scope of supply: partial renewal flue gas desulfurization
Place: Wupptertal, Germany
Client: Wuppertaler Stadtwerke
Construction period: 2002
Scope of supply: 170t superstructure Ohligsmühle
Place: Hamm, Germany
Client: Alstom Power Systems
Construction period: 2010
Construction weight: 6.000t
Scope of supply: erection of boiler frame
Place: Laufen/Germany
Client: Straßenbauamt Traunstein
Construction period: 2002
Scope of supply: Renovation of monument-protected steel structures
Place: Köln, Germany
Client: Köln-Düsseldorfer Dt. Rheinschiffahrt AG
Scope of supply: modification from steam drive to diesel-hydraulic drive
Place: Galabovo, Bulgarien
Client: Alstom Power Systems
Construction period: 2008-2010
Construction weight: 11.300t
Scope of supply: erection works