DSD Brückenbau GmbH

ADA Ciganlija, Sava Bridge

Place: Belgrad, Serbia

Client: City of Belgrade, Joint-Venture PORR-DSD-SCT

Construction period: 2008 - 2012

Type of construction: cable stayed bridge

Contruction weight: 9.000 to

Total length: 964 m

Lenght of spans: 70 m - 108 m  -  80 m -  80 m - 376 m - 200 m -  50 m

 

tl_files/media/referenzen/DSD Brueckenbau GmbH/ADA/Ada 2.jpg          tl_files/media/referenzen/DSD Brueckenbau GmbH/ADA/Ada 3.jpg          tl_files/media/referenzen/DSD Brueckenbau GmbH/ADA/Ada 4.jpg

 

Mainspan as 3-cell box girder with orthotropic deck plate, Sidespan prestressed concrete

Railway bridge Deggendorf

Place: Deggendorf, Germany

Client: DB Netz AG, Niederlassung Süd

Construction period: 2008 - 2010

Type of construction: truss bridge

Construction weight: 2.450 to

Total length: 467 m

Length of spans:  84 m - 95,5 m - 106 m - 106 m - 74,5 m

 

tl_files/media/referenzen/DSD Brueckenbau GmbH/Deggendorf/Deggendorf 2.jpg          tl_files/media/referenzen/DSD Brueckenbau GmbH/Deggendorf/Deggendorf 3.jpg          tl_files/media/referenzen/DSD Brueckenbau GmbH/Deggendorf/Deggendorf 4.jpg

 

Single track main railway line Landshut. Bayerisch Eisenstein at Deggendorf with 5- span truss structure over the Danube. Superstructure were assembled on preassembly yard on west bank of Danube and then incrementally launched over abutment and concrete piers.

Viaduct Reichenbach

Place : Geraberg (Thüringen), Germany

Client: ARGE/Strabag Linz + Strabag Nürnberg

Construction period : 2001 - 2003

Type of construction: girder bridge

Construction weight: 6.300 to

Total length : 1000 m

Legth of spans : 40 m -50 m - 55 m - 65 m - 75 m - 80 m - 95 m - 105 m - 95 m - 80 m - 75 m - 70 m - 65 m - 50 m

 

tl_files/media/referenzen/DSD Brueckenbau GmbH/Reichenbach/Reichenbach 2.jpg       tl_files/media/referenzen/DSD Brueckenbau GmbH/Reichenbach/Reichenbach 3.jpg       tl_files/media/referenzen/DSD Brueckenbau GmbH/Reichenbach/Reichenbach 4.jpg

 

Seegartenbrücke

Place: Brandenburg an der Havel, Germany

Client :  Stadtverwaltung Brandenburg an der Havel

Construction period : 2004 – 2006

Type of construction: truss bridge

Construction weight: 1.100 to

Total lenght : 205 m

Length of spans: 52 m - 100 m  - 52 m

 

tl_files/media/referenzen/DSD Brueckenbau GmbH/Seegarten/Seegarten 2.jpg       tl_files/media/referenzen/DSD Brueckenbau GmbH/Seegarten/Seegarten 3.jpg       tl_files/media/referenzen/DSD Brueckenbau GmbH/Seegarten/Seegarten 4.jpg

 

Wendenheidebrücke

Place: Berlin, Germany

Client :  Senatsverwaltung für Stadtentwicklung, Berlin

Period of construction : 2006 – 2007

Type of construction : arch bridge

Construction weight: 560 to

Total length : 73,85 m

Length of spans: 73,85 m
 

tl_files/media/referenzen/DSD Brueckenbau GmbH/Wendenheidebruecke/Wendenheide 2.jpg       tl_files/media/referenzen/DSD Brueckenbau GmbH/Wendenheidebruecke/Wendenheide 3.jpg       tl_files/media/referenzen/DSD Brueckenbau GmbH/Wendenheidebruecke/Wendenheide 4.jpg

 

Sloboda Brücke

Place: Novi Sad, Serbia

Client: The City of Novi Sad (financed by the European Agency for Reconstruction)

Construction period: 2002 - 2005

Type of construction: main brigde cable stayed bridge, approach bridges as steel composite bridges

Construction weight: 4.464 to

Total length: 1311 m

Length of spans : 10 m - 30m - 4 x 60 m - 591 m - 3 x 60 m

 

tl_files/media/referenzen/DSD Brueckenbau GmbH/Sloboda Bruecke/Sloboda 2.jpg          tl_files/media/referenzen/DSD Brueckenbau GmbH/Sloboda Bruecke/Sloboda 3.jpg          tl_files/media/referenzen/DSD Brueckenbau GmbH/Sloboda Bruecke/Sloboda 4.jpg

Railway bridge Rathenow

Place: Rathenow, Germany

Client: DB Netz AG, Regionalbereich Südost

Construction period: 2008 - 2009

Type of construction: truss bridge

Construction weight: 2.275 to

Total length: 212,60 m

Length of spans: 40 m - 90 m  -  80 m

 

tl_files/media/referenzen/DSD Brueckenbau GmbH/Rathenow/Rathenow 2.jpg          tl_files/media/referenzen/DSD Brueckenbau GmbH/Rathenow/Rathenow 3.jpg          tl_files/media/referenzen/DSD Brueckenbau GmbH/Rathenow/Rathenow 4.jpg

 

Canal bridge Magdeburg

Place: Hohenwarthe, Germany

Client: Wasserstraßenneubauamt Magdeburg

Construction period: 1998 - 2002

Type of construction: girder bridge

Construction weight: 24.000 to

Total length: 918 m

Length of spans : 51,7 m - 106,2 m - 57,1 m

 

tl_files/media/referenzen/DSD Brueckenbau GmbH/Magdeburg/Kanalbruecke M 2.jpg          tl_files/media/referenzen/DSD Brueckenbau GmbH/Magdeburg/Kanalbruecke M 3.jpg          tl_files/media/referenzen/DSD Brueckenbau GmbH/Magdeburg/Kanalbruecke M 4.jpg

 

Zurück Vorwärts