DSD Brückenbau GmbH
Place: Belgrad, Serbia
Client: City of
Belgrade, Joint-Venture PORR-DSD-SCT
Construction period: 2008 - 2012
Type of construction: cable stayed bridge
Contruction weight: 9.000 to
Total length: 964 m
Lenght of spans: 70 m - 108 m - 80 m - 80 m - 376 m - 200 m - 50 m

Mainspan as 3-cell box girder with orthotropic deck plate, Sidespan prestressed concrete
Place: Deggendorf, Germany
Client: DB Netz AG, Niederlassung Süd
Construction period: 2008 - 2010
Type of construction: truss bridge
Construction weight: 2.450 to
Total length: 467 m
Length of spans: 84 m - 95,5 m - 106 m - 106 m - 74,5 m

Single track main railway line Landshut. Bayerisch Eisenstein at Deggendorf with 5- span truss structure over the Danube. Superstructure were assembled on preassembly yard on west bank of Danube and then incrementally launched over abutment and concrete piers.
Place : Geraberg (Thüringen), Germany
Client: ARGE/Strabag Linz + Strabag Nürnberg
Construction period : 2001 - 2003
Type of construction: girder bridge
Construction weight: 6.300 to
Total length : 1000 m
Legth of spans : 40 m -50 m - 55 m - 65 m - 75 m - 80 m - 95 m - 105 m - 95 m - 80 m - 75 m - 70 m - 65 m - 50 m

Place: Brandenburg
an der Havel, Germany
Client : Stadtverwaltung Brandenburg an der Havel
Construction period : 2004 – 2006
Type of construction: truss bridge
Construction weight: 1.100 to
Total lenght : 205 m
Length of spans: 52 m - 100 m - 52 m

Place: Berlin, Germany
Client : Senatsverwaltung
für Stadtentwicklung, Berlin
Period of construction : 2006 – 2007
Type of construction : arch bridge
Construction weight: 560 to
Total length : 73,85 m
Length of spans: 73,85 m

Place: Novi Sad, Serbia
Client: The City of Novi Sad (financed by the European Agency for Reconstruction)
Construction period: 2002 - 2005
Type of construction: main brigde cable stayed bridge, approach bridges as steel composite bridges
Construction weight: 4.464 to
Total length: 1311 m
Length of spans : 10 m - 30m - 4 x 60 m - 591 m - 3 x 60 m

Place: Rathenow, Germany
Client: DB Netz AG, Regionalbereich Südost
Construction period: 2008 - 2009
Type of construction: truss bridge
Construction weight: 2.275 to
Total length: 212,60 m
Length of spans: 40 m - 90 m - 80 m

Place: Hohenwarthe, Germany
Client: Wasserstraßenneubauamt Magdeburg
Construction period: 1998 - 2002
Type of construction: girder bridge
Construction weight: 24.000 to
Total length: 918 m
Length of spans : 51,7 m - 106,2 m - 57,1 m